Lighting (18)

North and West Lighting

The Old Tube Light I installed the old 48″ double tube fluorescent fixtures from the Halland layout. In total 3 fixtures…

Lighting (3)

Slim Lighting the Valance

Slim Fluorescent As I mentioned in my post Valance Brackets, I’m using linkable slim fluorescent lighting for the valance. The lights…

Benchwork (75)

Desks, Decks and a Beautiful Skyboard

I added the keyboard tray to the bottom of the desk. Everything fits! Yeah! I still need to cut some…

Benchwork (72)

Time for a New Desk

When I built my Halland Yard layout, I decided to build my office desk into the closet. It was primarily…

Track Plan - Industrial Lead 23

Track Plan 23

Not much change. Just made it 1″ wider on the south and west sides to reflect the benchwork.

Benchwork (65)

Finishing the Main Deck

I was able finish up cutting the main deck. I cut a filler piece for the east wall, filled a…

Benchwork (59)

Valance Brackets

I painted the top and underside of the valance Polar White. Then installed the triangle brackets that provide the permanent…

Camp Trailer

There are quite a few campers, camp trailers and motor homes in the area. I’ll probably model one like the…

Benchwork (53)

Benchwork Continues – Into the Closet

More benchwork today. I started with a tricky section that would be the sub-roadbed where the main layout enters the…

Benchwork (46)

Touch up and Valance 4-16-2012

A couple extra hours of work allowed me to do a little touch up and finish out the valance frame….